Get a Quote

Projects & Case Studies

Three CFRP strengthening projects with quantities listed: a tendered bridge repair in Islamabad (2021–2023), a 25,000 m² private-label fabric supply in Southeast Asia (2024) and an 18-story office upgrade in Bangkok (2025). Each card lists the CFRP fabric, plate and adhesive quantities used.

Featured Projects

Photos marked as illustration are not from the project site.

2021–2023 · Pakistan
Underside of a concrete bridge deckPhoto for illustration

Bridge repair and strengthening, Islamabad

Tendered municipal project

Maintenance and repair of a major bridge in Pakistan's capital, awarded by public tender.

2,500 m²carbon fabric
1,078 mcarbon plate
4 tepoxy adhesives

The client audited our factory and reviewed our design calculations; we issued a 50-year service-life warranty letter.

2024 · Southeast Asia
Modern public building façadePhoto for illustration

Private-label supply to a Fortune 500 building-materials group

Civil and public building strengthening market

Carbon fiber fabric produced under the customer's own brand, sold into the civil and public building strengthening market.

25,000 m²single order
10,000 m² at 300 g/m² + 15,000 m² at 230 g/m²

Sold under their brand — volume supply inside an OEM program.

2025 · Thailand
Site photo, Bangkok office refurbishment, 2025

18-story office refurbishment, Bangkok

Fabric and plate on one project

Structural upgrade of an 18-story office building in Bangkok.

18,000 m²fabric, 300 g/m²
4,000 mplate, 1.2 × 100 mm

Plate bonded to beam soffits for flexure, fabric wrapped around columns for confinement — the full fabric-and-plate method on one site.

Have a Project in Mind?

Send us the member sizes or drawings and the strengthening target; we reply with a system recommendation and quantities.